Case Study

Mawo Bridge Replacement

DPWH Region VIII · Victoria, Northern Samar

₱130M
Contract Value
40%
JV Share
2017
Completed
The Brief

Replacing a bridge along a key provincial route

Mawo Bridge sits along a provincial route in Victoria, Northern Samar. DPWH Region VIII commissioned its replacement (Phase 1) to bring the crossing up to current structural standards. CTC Construction and Supplies delivered the works as part of a joint venture, holding a 40% share of the contract.

Scope of Work

What the project covered

  • Substructure and foundation works for the replacement span
  • Superstructure erection and deck construction
  • Road tie-in and approach works
  • Delivered under a joint-venture arrangement with DPWH Region VIII (40% share)
Project Details

By the numbers

Client
DPWH — Region VIII
Nature
Bridge Construction
Location
Victoria, Northern Samar
Mode
Joint Venture — 40%
Process

How it came together

1

Mobilization

Site setup and joint-venture mobilization in Victoria, Northern Samar.

2

Substructure

Foundation works for the replacement span.

3

Superstructure & Deck

Span erection, deck construction, and road tie-in at both approaches.

4

Turnover

Completed and turned over to DPWH Region VIII, 2017.